All projects
Elm Court
Hall bath in green tile
A pink 1980s bathroom, stripped to the studs and rebuilt with proper waterproofing.
Cost
Weeks on site
Size
Year
2026
Service
The story
How the job went.
A 1980s pink bathroom with cracked tile and a damp corner. We stripped it to the studs, fixed the wall behind it, and waterproofed the whole room.
Green handmade tile, an oak vanity and a round mirror. Four weeks, no surprises.

Your turn
Want a result like this?
Tell us the job, the size and your postcode. We reply the same working day with a price range and the next free slot.

